Humber Model: Test 3. Chart 3A—After 2.5 tide years without Bridge. River Discharge 'Low'
- Reference No:
- C DPD/1/3/4/14/31
- Dates:
- [c 1931]
- Description:
A chart showing the results of a test using a model of the Humber to study the effects of the proposed Humber Bridge on the sandbanks and navigable channels of the Estuary.
Scale: 3 inches to 1 mile [1:21120]
Dimensions: 560 x 1945mm
- Format:
- Archive Item
- Extent:
- 1 item
- Language:
- Access Conditions:
- Access will be granted to any accredited reader
- Repository:
- Hull City Archives
- Collection:
- Records of Humber Conservancy and the Humber Ports (Records deposited by Associated British Ports and its Predecessors)