- Reference No:
- C DPD/1/3/5/1/215
- Dates:
- 8 Jul 1914-2 Jan 1934
- Description:
- File comprises correspondence between the engineer to the Humber Conservancy Board, Board of Trade, Westminster, Borough Engineer, Grimsby, and the Grand Central Railway, Manchester, regarding the inspection of foreshore land at Grimsby, Victoria Dock, Hull, Cherry Cob Sands, and adjacent to Saltend, prior to possible leasing or purchase. Includes a list showing a schedule of inspection for foreshore sites throughout the River Humber System, in 1922 and 1930, as well as plans of the Earles Shipbuilding site at Victoria Dock, Hull, and maps showing the Foreshore proposed to be purchased in 1877, 1880, 1882, and 1892, prior to the proposed construction of King George Dock, Hull.
- Format:
- Archive Item
- Extent:
- 1 file
- Language:
- Access Conditions:
- Access will be granted to any accredited reader
- Repository:
- Hull City Archives
- Collection:
-
Records of Humber Conservancy and the Humber Ports (Records deposited by Associated British Ports and its Predecessors)