Plans, specifications etc., relating to the replacement of the main trawl winch and fitting of drums to the Arctic Corsair
- Reference No:
- C DBBL/7/3/2
- Dates:
- Jan 1994-Jul 1995
- Description:
Loose Plans:
Proposal for net drum with gilson drum design and location plan - 2 plans
Main winch lubrication points plan - 2 plans
Bound Plans:
Ulstein Brattvagg specifications and plans, including electrical and pipe plans
Documentation:
Hydraulik Brattvaag, installation/maintenance documentation
Specification of work to be carried out in relation to the replacement of both the main trawl winches and fitting of independent drums